Zumbro Lutheran Church
This project included installing a new TPO Roof, nichia panels on the exterior, new parking lot / lights and new windows, exterior railings. The project also consisted of installing a new elevator in an existing stair shaft, updating the existing elevator and remodeling the sanctuary and remolding the main level. Throughout the duration of construction, the team installed 15 new air handling units and worked while the church was still in operation prior to it being shutdown for COVID-19.